For an existing factory, the cheapest automation usually starts with visibility and the bottleneck: measuring where the line stops, then fixing that step. As an indication for 2026, a machine-level control retrofit costs about US$2,000–8,000 and three or four days, a mid-size line control retrofit about US$26,500 in a published example with payback of about six months, and a visibility system for a line from about US$9,400. CISH supplies, installs and commissions complete lines with maintainable automation, and upgrades lines it supplies.

Three kinds of automation partner

System integratorMachine builder or supplierLine company
What they doControl design, PLC and HMI programming, SCADA, data, panel building, integrationBuild and automate their own machinesSpecify, supply and commission complete lines, including controls
Best whenMachines are sound but controls are old, unreliable or disconnectedOne machine is the bottleneck or unreliableThe line needs to be rebuilt, expanded or replaced
StrengthControls and data across many makesDeep knowledge of one machine typeResponsibility for the whole line's output
Watch forMechanical problems they cannot fixIntegration with other machinesFit with your existing equipment

We do not name or rate companies. Ask which kind each one is, because many describe themselves as all three.

Where automation pays first on an existing line

  1. Measure. Count output, stops and rejects by machine and shift, automatically if possible. Many lines lose most of their output at one or two machines. Our guide to measuring OEE on an old line shows how without replacing the controls.
  2. Fix the bottleneck. Automate or upgrade the step that limits output: often filling, packing or a manual transfer between machines.
  3. Replace obsolete controls. If spares for the PLC or drives are no longer available, a breakdown can stop the line for weeks. A control retrofit removes that risk. Our article on when to upgrade your PLC lists the signs.
  4. Automate labour-heavy steps. Case packing, palletising and labelling are common.
  5. Add quality inspection. Vision systems or checkweighers where rejects or complaints are costly.
  6. Connect and report. Dashboards and SCADA once the line runs reliably.

What it costs (2026 indications)

WorkIndicative costNotes
Machine-level control retrofitAbout US$2,000–8,000Depends on I/O and HMI; typically 3–4 days
Mid-size line control retrofitAbout US$26,500 in a published exampleHardware, engineering, wiring and commissioning; payback about six months in that case
Visibility (data and dashboards) for one lineFrom about US$9,400Sensors, data collection, reports
Full performance retrofitAbout US$94,000–155,000Controls, data, optimisation
New automated packaging or lineQuoted per configurationDepends on product and speed

Our digitalisation cost guide breaks the tiers down.

How to choose an automation company

  • References on similar lines: ask for two or three running projects in your industry, and visit one.
  • The engineers: meet the people who will program and commission your system.
  • Standards and hardware: prefer common, well-supported PLCs and drives with local spares, and insist on receiving the programme and documentation.
  • Panel building and wiring quality: look at a finished panel.
  • Safety: guarding, emergency stops and safety circuits to the Driven Machinery Regulations.
  • Support: remote access, call-out times and spares.
  • Ownership of software: you should own the programme, passwords and source files.

The Southern African Instrumentation and Control Association is the professional body for the instrumentation and control field, and can be a starting point for finding practitioners.

From a delivered project: A Johannesburg injection moulding cell about to buy a fifth machine first spent about R280,000 on a three-week visibility retrofit; the data showed scrap on two products, night-shift cycle drift and one mould running 14% slow, and fixing them recovered about 17 points of OEE, so the fifth machine was deferred. Read the OEE retrofit case study.

Questions to ask before you sign

  1. What will the line produce after the project, and how will we measure it?
  2. What happens to production during the changeover, and how long is the shutdown?
  3. Which parts of the old system will be reused?
  4. Who will maintain the system, and what training is included?
  5. Do we receive the source code, drawings and backups?

Energy and automation

Eskom's standard tariff rose 8.76% for 2026/27. Drives that slow motors when the line is not at full speed, compressors controlled to demand, and machines that stop when idle can save energy as well as labour. Ask your automation partner for an energy estimate alongside the output estimate.

Worked example: a snack factory

A snack maker in KwaZulu-Natal has a fryer, seasoning drum and two packing machines, but output varies by shift and the supervisor reports figures by WhatsApp. A system integrator adds counters and stop reasons on each machine and a simple dashboard. The data shows the packing machines stop when the seasoning drum overfeeds them. The integrator reprograms the drum to run on demand from the packers, and the factory gains about a shift of output a week without new machines. Two years later, with growth, the owner asks a line company to supply a faster packing section. The figures are illustrative.

Common mistakes

  • Starting with a dashboard before the line runs reliably.
  • Automating a step that is not the bottleneck.
  • Uncommon hardware with no local spares.
  • No source code or documentation handed over.
  • No plan for the shutdown period.

Start with a pilot

Before automating a whole factory, run a pilot on one line or one machine: measure before, make the change, measure after. A pilot shows what the automation company can deliver, how your operators respond, and what the real savings are. If it works, roll it out to other lines with the same design, which is cheaper and faster than designing each project from scratch.

Skills on your side

Automation needs people who can keep it running. Train at least one electrician or technician to read the PLC programme, change settings, replace sensors and drives, and restore a backup. Keep spare sensors, drives and an HMI on the shelf. Agree with your automation partner how much training is included and ask for written procedures.

Data you can use

Choose a small set of numbers that matter: output per shift, stops and their causes, rejects and energy use. Display them where operators and supervisors can see them, and review them weekly. Data that nobody looks at does not improve a line.

Shutdown planning

Most automation projects need the line stopped for installation and testing. Plan the shutdown in a quiet period, build stock beforehand, and agree a detailed day-by-day plan with the automation company, including how to restart on the old system if something goes wrong.

Where CISH fits

CISH supplies complete production lines with maintainable controls, common PLCs and drives, documented programmes and spares, from audited factories in China, and installs and commissions them with output demonstrated. For lines we have supplied, we also upgrade controls and add automation. For automation of mixed equipment from many makers, a local system integrator is often the better partner, and we will say so.

Frequently asked questions

What does an industrial automation company do?

It designs, programs and installs control systems, connects machines, adds data and reporting, or supplies automated machines and lines.

Should I use a system integrator or a line company?

A system integrator for controls and data on sound machines; a line company when the line itself needs to be rebuilt or replaced.

Where should I start automating an existing line?

Measure where the line loses output, then fix that bottleneck before adding dashboards.

How much does a PLC retrofit cost?

As an indication for 2026, about US$2,000–8,000 for a machine-level retrofit; a mid-size line retrofit was about US$26,500 in a published example.

Should I own the PLC programme?

Yes. Insist on receiving the programme, passwords, drawings and backups.

Does CISH automate existing lines?

We upgrade lines we have supplied and supply new automated lines. For mixed equipment from many makers, a local integrator is often better.