Measure all three every shift, find the biggest loss, fix it, and measure again. When buying a new line, write output, availability and quality into the acceptance test. CISH supplies, installs and commissions complete production lines with output demonstrated at handover and operators trained to run them efficiently.

What production efficiency means

People use "efficiency" for several different things:

TermWhat it measuresUseful for
Output per hourUnits or kilograms produced per hourDaily management, but hides causes
Labour productivityOutput per worker or per labour hourStaffing and costing
YieldGood output as a share of raw material usedRaw material cost
Energy per unitkWh or fuel per tonne or per thousand unitsUtility cost
OEEGood output as a share of what the line could make in planned timeFinding and fixing line losses

OEE is the most useful for a production line because it splits losses into three causes you can act on.

How OEE works

OEE = Availability × Performance × Quality.

  • Availability = run time ÷ planned production time. It falls with breakdowns, changeovers, waiting for materials and power interruptions.
  • Performance = actual output ÷ (run time × rated speed). It falls when the line runs slowly or stops briefly and often.
  • Quality = good output ÷ total output. It falls with rejects, rework and start-up waste.

A worked example

ItemValue
Shift length8 hours
Planned breaks0.5 hours
Planned production time7.5 hours
Downtime (breakdowns, changeover)1.1 hours
Run time6.4 hours
Rated speed1,000 units per hour
Actual output5,760 units
Good units5,590
  • Availability = 6.4 ÷ 7.5 = 85%
  • Performance = 5,760 ÷ (6.4 × 1,000) = 90%
  • Quality = 5,590 ÷ 5,760 = 97%
  • OEE = 0.85 × 0.90 × 0.97 ≈ 74%

The line made 5,590 good units against 7,500 possible in planned time. The biggest single loss here is availability: more than an hour of downtime.

The six big losses

LossOEE factorTypical causes
BreakdownsAvailabilityWorn parts, poor maintenance, electrical faults
Set-up and changeoversAvailabilityMany product changes, slow change parts, missing tools
Minor stopsPerformanceJams, misfeeds, sensor trips
Reduced speedPerformanceRunning slow to avoid problems, worn equipment, untrained operators
Start-up rejectsQualityUnstable process after starting or changing over
Production rejectsQualityWrong settings, poor raw material, worn tooling

How to measure efficiency on your line

  1. Define planned production time for each shift, excluding planned breaks.
  2. Record every stop longer than a few minutes, with the reason, on a simple sheet or counter.
  3. Count total output and good output at the end of the line.
  4. Use the rated speed of the bottleneck machine, not the fastest one.
  5. Calculate availability, performance and quality for each shift.
  6. Review weekly, ranking losses by hours or units lost.

You do not need new software to start. Paper records or a spreadsheet, kept honestly, show where the losses are. Our guide to measuring OEE on an old line covers practical methods.

How to improve production efficiency

Availability

  • Plan preventive maintenance from the manufacturer's schedule and your breakdown records.
  • Shorten changeovers: prepare tools and materials before the stop, standardise settings, and train for speed.
  • Keep raw materials and packaging at the line before the shift starts.
  • Protect against power interruptions where they stop the line.

Performance

  • Find the true bottleneck; speeding up other machines does not help.
  • Fix the causes of minor stops, such as misaligned guides, poor packaging material or sensor positions.
  • Train operators to run at rated speed with confidence.

Quality

  • Standardise start-up and changeover procedures.
  • Check raw material quality on intake.
  • Replace worn tooling, moulds, knives and seals on schedule.

Who owns efficiency on the factory floor

Efficiency improves when someone is responsible for it every shift, not when it is reported once a month. In a small factory that is usually the shift supervisor, who records stops and rejects, and the production manager, who reviews the numbers weekly and decides what to fix first. Maintenance staff own the breakdown and minor-stop losses; quality staff own rejects and start-up waste; purchasing owns the raw material and packaging problems that cause jams.

Keep the review short and practical. Look at last week's three biggest losses, agree one action for each, and check next week whether the number moved. Post the OEE figure where operators can see it, and explain what it means, so the people running the line understand how their work shows up in it.

Efficiency differs by type of line

Not every line loses efficiency in the same place. On high-speed filling and packaging lines, minor stops and changeovers usually cost the most. On mills, extruders and process lines that run for days, breakdowns and quality drift matter more, because one long stop or one bad batch loses a lot of output. On batch processes, such as mixing or cooking, waiting time between batches is often the hidden loss. Start your measurement where your type of line usually loses most.

Energy and efficiency in South Africa

Electricity is a large and rising cost for South African manufacturers; Eskom's 2026/27 tariff increase is the latest step. A line that runs at low OEE uses power while making less good product, so energy per good unit rises. Improving availability and quality usually cuts energy per unit as much as any new motor does. Track kWh per tonne or per thousand units alongside OEE.

Safety while improving

Faster changeovers and quick fixes must not mean working on running machines. Under the OHS Act and the Driven Machinery Regulations, machines must be stopped and isolated before maintenance, and guarding must stay in place. Build lock-out steps into every changeover procedure.

Building efficiency into a new line

When you buy a new production line, efficiency starts in the contract:

Contract itemWhat to specify
Rated outputUnits or kg per hour on your product, at the bottleneck
Acceptance testOutput measured over a full shift or several shifts, not a short burst
QualityGood output share during the test
AvailabilityAllowed downtime during the test
ChangeoversTime to change between your main products
TrainingOperator and maintenance training included
DocumentationMaintenance schedules and settings

Our guide to why lines miss rated output lists the common gaps between a brochure and a real shift.

From a delivered project: A Johannesburg injection moulding cell about to buy a fifth machine first spent about R280,000 on a three-week visibility retrofit; the data showed scrap on two products, night-shift cycle drift and one mould running 14% slow, and fixing them recovered about 17 points of OEE, so the fifth machine was deferred. Read the OEE retrofit case study.

Common mistakes

  • Measuring only output per day. It hides which loss to fix.
  • Using the fastest machine's speed instead of the bottleneck's.
  • Not recording short stops. Minor stops often cost more than breakdowns.
  • Chasing speed while quality falls.
  • Accepting a new line on a one-hour test.

Where CISH fits

CISH supplies, installs and commissions complete production lines from audited factories in China, with output on your product demonstrated over a full acceptance test, changeover and maintenance procedures documented, and operators trained to run the line at its rated efficiency.

When measurement shows you need more output, see how to increase production capacity; to test the investment, the payback period worked example.

Frequently asked questions

What is production efficiency?

How much good product a line makes compared with what it could make in the time available. OEE is the most widely used measure for production lines.

How do you calculate OEE?

Multiply availability (run time ÷ planned time), performance (actual output ÷ run time × rated speed) and quality (good output ÷ total output).

What is a good OEE?

It depends on the industry and line. Figures around 85% are often quoted as world class; many lines run well below that, and the trend matters more than the number.

What is the fastest way to improve efficiency?

Record every stop and reject for a few weeks, rank the losses, and fix the biggest one first. Often that is changeovers or minor stops.

Do I need software to measure OEE?

No. Start with honest paper or spreadsheet records per shift; software helps later.

How do I make sure a new line is efficient?

Write rated output, quality and allowed downtime into the acceptance test, measured over a full shift on your product.